Purpose
- Show the agreement between the Zenith Path Delays (ZPDs) estimated by the EPN Analysis Centres (ACs)
- Visualize potential periodic signals
- Reflect changes in, e.g. used options, analysis procedures etc.
Procedure
- EPN ACs are estimating ZPDs on a daily basis
- These estimates are combined to create the EPN combined (mean) ZPD solution considering the biases (provided in this plot) between the individual solutions
- The resulting daily biases show the agreement of the ACs solutions to each other and to the combined ZPD solution
Solutions
- Results from GPS weeks 834 until 1407 are based on EPN-repro1 results.
- Results from GPS weeks 1408 until present are coming from the routine data analysis
- Note that the number and composition of the ACs contributing to the combined solution for this station may differ between reprocessing and routine operation.