RESPONSIBLE AGENCY INRIM (Istituto Nazionale di Ricerca Metrologica)
RESPONSIBLE FOR METADATA INRIM (Istituto Nazionale di Ricerca Metrologica)
CURRENT STATION CONFIGURATION ieng00ita_20230704.log
STATUS IN EPN included since 01-02-2004
DATA LICENSE CC-BY-4.0
LAST AVAILABLE DATA 15-07-2024
LAST RECEIVER SEPT POLARX5TR (27-06-2023 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS+IRNSS+SBAS
LAST ANTENNA SEPCHOKE_MC/NONE (11-04-2019 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY BEK, IGE, ROB, SGO, UPA
INCLUSION IN OTHER NETWORK(S) IGS, EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 17-03-2022.

RINEX V2.11 - GPS+GLO+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 074/2022 N/A
BEV 074/2022 N/A
BKGI 074/2022 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS+IRNSS+SBAS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 191/2024 78.57%
BEV 197/2024 100%
BKGI 197/2024 100%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 198/2024 (L) 100% 87.5%
BKGI 198/2024 (L) 98.21% 98.21%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Real-time

IENG00ITA0 :

  • ASI (broadcaster, registration) - RTCM 3.3 : GPS+GLO+GAL+BDS+QZSS+SBAS (MSM7)

    2024/07/15 20:43 RTCM 3.3 Missing Coordinates

  • BKG (broadcaster, registration) - RTCM 3.3 : GPS+GLO+GAL+BDS+QZSS+SBAS (MSM7)

    2024/07/15 18:39 RTCM 3.3 Missing Coordinates

  • ROB (broadcaster, registration) - RTCM 3.3 : GPS+GLO+GAL+BDS+QZSS+SBAS (MSM7)

    2024/07/15 23:33 RTCM 3.3 Missing Coordinates

information above extracted from monitor files - https://epncb.oma.be/pub/station/real_time/

Location

Pictures