RESPONSIBLE AGENCY SGA (State Geodetic Administration)
RESPONSIBLE FOR METADATA SGA (State Geodetic Administration)
CURRENT STATION CONFIGURATION zada00hrv_20240318.log
STATUS IN EPN included since 16-06-2013
LAST AVAILABLE DATA 17-04-2024
LAST RECEIVER TRIMBLE ALLOY (17-03-2024 to now)
SET TO TRACK GPS+GLO+GAL+BDS+QZSS
LAST ANTENNA TRM115000.00/TZGD (20-08-2019 to now)
INDIVIDUAL CALIBRATION(S) none
DATA ROUTINELY ANALYSED BY ASI, BKG, MUT, SGO, SUT
INCLUSION IN OTHER NETWORK(S) EPOS

The RINEX 2 data are no more submitted to the EPN data centres since 22-04-2021.

RINEX V2.11 - GPS+GLO
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 108/2021 N/A
BEV 108/2021 N/A
BKGE 108/2021 N/A
RINEX V3.04 - GPS+GLO+GAL+BDS
Daily
(data calendar)
Data centres Online Last data Availability Download
EPNCB (historical) 100/2024 60.71%
BEV 108/2024 75%
BKGE 108/2024 75%
Hourly

No recent data available

Hourly
Data centres Online Last data Availability Latency
BEV 110/2024 (T) 97.62% 0%
BKGE 110/2024 (U) 97.02% 90.48%

Daily and Hourly Latency Plots

Recent RINEX file errors detected by BKG data centre: web page, API (JSON format)

BKG upload settings to other data centres.

Location

Pictures